
Brown County Parks reports that there will be some curb and gutter removal at the Fox River Trail crossing of Bomier Street.
Concrete will be removed, and temporary ramps will be in place to allow bikes and pedestrians to cross Bomier Street while the concrete is poured and cured.
Temporary ramps will be in place until Wednesday, July 28 at the latest, or until the concrete reaches its opening strength.












