There will be lane closures on the Broadway Street Bridge and the 21st Street Bridge over the Manitowoc River.
The lane closures are scheduled for Monday, July 22nd. The lane closures will be from approximately 8:00 A.M. to 3:00 P.M.
One lane of traffic in each direction will be maintained at all times during the work.
The lane closures are needed for the City’s Consultant to perform non-destructive testing on the concrete bridge decks.













